Key facts

Operator
Tideway
Length
approximately 25 km
Diameter
up to 7.2 m
Purpose
Intercept combined sewer overflow discharges to the tidal Thames
Overflows intercepted
the great majority of discharge volume in central London
Funding
A separately regulated infrastructure provider, recovered through Thames Water bills

Context

The tunnel exists because London’s sewers are combined — they carry both sewage and rainfall — and were sized for a much smaller population and a far less paved city. Rather than separating the systems, which would mean rebuilding the drainage of central London, the tunnel captures the overflow and conveys it to Beckton for treatment. It is the largest single water infrastructure project undertaken in the UK in modern times.

Relationships

Related intelligence

Sources