Key facts

Event type
Drought
Started
1995-04-01
Ended
1996-03-31

Cause

An exceptionally dry period combined with a supply system that was poorly interconnected, so water could not be moved from areas with resource to areas without.

Impact

  • Reservoir storage fell to critical levels
  • Road tankering of water between reservoirs
  • Preparation for standpipes and rota cuts

Response

Emergency tankering, hosepipe bans, and rapid construction of a regional grid connecting previously isolated sources.

Aftermath

Established interconnection as a core UK resilience principle. Yorkshire Water now operates one of the most integrated regional grids in England, and the episode is still cited in every UK water resources plan.